WHAT’S HOT NOW

Cari Blog Ini

Teknologi & Gadget

Gambar tema oleh kelvinjay. Diberdayakan oleh Blogger.

Ads

Lifestyle

Games

Movies

» »Unlabelled » Comuterline

KA Commuter Jabodetabek (also called KRL Commuter Line, formerly known as Jabodetabek KRL) isthe electrictrain lines operated by PT KAICommuter Jabodetabek, a subsidiary of PT Kereta Api Indonesia (PTKA).KRL has been operating in Jakarta since 1976, up to now serve the commutersin Jakarta, Bogor, Bogor regency, Bekasi, Tangerang City, and South Tangerang City. 
Staats Spoorwegen, the train operator owned Dutch colonial government,railway line electrification project start Tanjung Priok - Meester Cornelis(Djatinegara) in 1923 and inaugurated in 1925. Electrification projectcontinues on the circumference of Jakarta, Bogor and Bekasi up. Trains usedis anelectric locomotive factory-built 3000 series SLMBBC (SwissLocomotive & Machine works Brown Baverie Cie), series 3100 electriclocomotive manufactured AEG (Allgemaine Electricitat Geselischaft) German-made electric locomotive series 3200 Werkspoor Netherlands and electric trains Westinghouse manufactured and factory-made electric train General Electric. 

             Terelektrifikasi train line that continues to be used and expanded operational area since Indonesian independence. The operation of the railway line inIndonesia implemented by Djawatan Repoeblik Indonesian Railway (now asPTKA). Locomotive which has been used since the days of the Dutch and not considered feasible path is replaced by a series of electric trains made 
​​inJapan since 1976. Since 2000, the Government of Indonesia routinely receivea series of grants and the purchase of electric trains from Japan, which isthen used to add to the fleet of electric trains Jakarta . 

            In 2008 formed subsidiary of PT KA, PT KAI Commuter Jabodetabek (KCJ),which focuses on the operation of an electric railway line in the area of Regional Operations (DAOP) 1 Greater Jakarta, which at that time had 37trains that serve the Greater Jakarta area. PT KCJ start KRL transitmodernization projects in 2011, to simplify the existing route into 5 major routes, elimination of express electric train, the application of a special car for women, and change the name of economic KRL Commuter Train conditionedinto. The project continued with the renovation, rearrangement, andsterilization facilities and infrastructure including rail lines and train stations, as well as the placement of the security forces on each carriage.When the Tanjung Priok Station opened again after a total renovation in 2009, the electric train line increased to 6, although not yet fullyoperational. In July 2013, PT KCJ began implementing an electronic ticketing system commet (Commuter Electronic Ticketing) and train fare system changes.

«
Next
Posting Lebih Baru
»
Previous
Posting Lama

Tidak ada komentar:

Leave a Reply